Skip to content

For Nigerians abroad building at home

Far from home, never out of sight.

Verified supervisors capture site evidence that can't be faked. Your money waits with a licensed escrow partner and is released milestone by milestone — only when the work is confirmed and you approve.

  • Held by a licensed escrow partner, never by iBackHome
  • Keep your own contractor
A modern white duplex with a cantilevered upper floor, stone cladding, a green terrace and cars in the carport.

A home like this starts as a plot and a promise.

Every site checked

Anywhere in Nigeria

From Enugu to Lagos, Abuja to Port Harcourt

Wherever your plot is, you can see it going up. We match a vetted supervisor to the site, not to a city.

  • An aerial view of Enugu: red roofs among trees and a lake at dusk.
    EnuguHills, lakes and a growing number of family homes.
  • Rooftops of an Abuja neighbourhood below Zuma Rock at sunset.
    AbujaEstates and family houses in the shadow of Zuma Rock.
  • An aerial view of Lagos: new apartment blocks beside a busy road.
    LagosApartment blocks and compounds rising beside the road.
  • An aerial view of Port Harcourt's riverbank homes and the road bridge.
    Port HarcourtRiverside homes and new builds on the delta.

Photography is illustrative: real Nigerian homes and building sites, not iBackHome customers' projects.

The problem

Building from abroad shouldn't cost you your savings

You can't see what happens on site. So you send money, ask for photos and hope. That's where it goes wrong.

  • Materials go missing

    Cement, blocks and rods paid for your house end up on someone else’s site.

  • Quotes get inflated

    Prices padded well above what materials actually cost locally, with no way for you to check.

  • Photos get recycled

    Old or borrowed pictures arrive as “this week’s progress”, late and looking much like last week’s.

The damage isn't only financial. When trust breaks, family relationships often break with it.

How it works

Four steps. No money moves without proof.

See the full release flow ›
  1. 1

    Set up

    Invite your own contractor, agree a bill of quantities split into milestones, and pin your site on the map.

  2. 2

    Verified site visits

    A vetted, registered supervisor visits on schedule and unannounced, capturing evidence in our app.

  3. 3

    Milestone approval

    When your contractor says a stage is done, the supervisor verifies it. Then you review the proof and approve.

  4. 4

    Escrow release

    Only then does the licensed escrow partner pay your contractor. Not before.

Foundation to finishing

See every stage as it happens

Your bill of quantities sets your milestones. At each one, a supervisor on site captures the proof before any money moves.

  • A builder walking along a foundation trench with the first course of blocks laid.
    Stage 1

    Foundation

    Trenches dug and the first course of blocks laid. Your supervisor photographs depth and levels.

  • Rows of freshly made sandcrete blocks drying in the sun.
    Stage 2

    Materials on site

    Sandcrete blocks, sand and cement counted against your bill of quantities.

  • A builder with a wheelbarrow of mortar in front of a half-built block wall.
    Stage 3

    Blockwork

    Walls rise course by course, each lift photographed inside your site boundary.

  • Workers in red helmets on timber formwork and steel rods before concrete is poured.
    Stage 4

    Steel and formwork

    Reinforcement and shuttering are checked before a single bag of concrete is poured.

  • Workers carrying loads on their heads up a scaffold of timber poles.
    Stage 5

    Slab and roof

    The slab and roof go up. The supervisor verifies the stage before you are asked to approve.

  • A finished three-storey house with a brick feature wall, balconies and a boundary fence.
    Stage 6

    Finishing

    Plaster, paint and fittings. The last milestone is verified and released like every other.

Proof, not promises

Evidence that can't be faked

  • In-app camera only

    There’s no upload button. Photos and videos can only be taken live, in the iBackHome app.

  • Stamped with place and time

    Each capture records where and when it was taken, signed by the supervisor’s registered phone.

  • Inside your site, or rejected

    Your site has a boundary on the map. Anything captured outside it is rejected automatically.

  • Reused photos get caught

    Every image is compared with every photo on iBackHome. Look-alikes are flagged for our team to review.

Every capture is checked
Accepted
  • Inside the site boundaryPassed
  • Signed by a registered phonePassed
  • Not reused or editedPassed

The escrow promise

Your money waits until the work is proven

Milestone · verified

Waiting for your approval

Held by a licensed escrow partner, never by iBackHome

Approve release
  • Never held by iBackHome

    Your money sits with a licensed escrow partner from the moment you pay.

  • Two keys to release

    A milestone is paid only after the supervisor verifies it and you approve it.

  • Disagree? It pauses

    Raise a dispute instead of approving. Nothing is released until it’s resolved.

Pay in GBP, USD or EUR. Your contractor is paid in naira, at the exchange rate recorded on the day you fund. How escrow works

Every Friday

A weekly report built only from facts

AI drafts a plain-language summary of your week from your project's own evidence, verifications and payments. Your supervisor checks it before it reaches you.

  • Points to the photos it’s based on
  • Money figures come straight from the payment record
  • Checked by your supervisor before it’s sent
  • Arrives on WhatsApp and email, in your time zone
AI-generated reportReviewed by your supervisor

Your weekly report

What was done on site this week, each point linked to the photo behind it, and what is waiting for your approval.

AI drafts and checks — it never approves, releases or pays.

For contractors

Good contractors get paid faster

Honest builders lose time waiting for clients who can't see their work. With iBackHome, the proof travels with the claim.

For contractors
  • Faster payment

    Verified milestones are approved sooner, and the escrow partner pays you in naira.

  • A track record

    Every verified milestone builds a record you can show the next client.

For the family you're building for

Come home to a house you watched go up

Every milestone has its photos, its place on the map and its date. When you land in Nigeria, the house is the one you approved, stage by stage.

Questions people ask

Is iBackHome a construction company?
No. You keep your own contractor. We verify what they claim on site and control when money moves.
Who holds my money?
A licensed escrow partner. iBackHome never holds client funds. Money is released milestone by milestone, only after verification and your approval.
Who are the supervisors?
Registered builders and engineers, matched to sites near them. We check their professional registration, NIN and two guarantors, rotate them across sites, and send others on unannounced spot checks.
What if I don’t agree a milestone is done?
Raise a dispute instead of approving. The release pauses, and our team reviews the evidence with you and your contractor before anything is paid.
Can someone send old or borrowed photos?
Not through iBackHome. The app has no upload button, every capture must be taken inside your site, and look-alike images are flagged for review.
Where do you work?
Anywhere in Nigeria. When you set up your project, we match a vetted supervisor near your site.
What does it cost?
A monthly supervision fee per project plus a small fee on each milestone you fund. See the pricing page for how it’s structured.

Build at home with proof, not promises

Start with your site address and your contractor's phone number. We'll handle the rest with you.